Minimising site disturbance Print

​​​​​​​​​The Site Analysis phase discussed in the previous section directs development to th​e most appropriate areas of a site to minimise disturbance. 

​​This includes minimising the potential extent of bulk earthworks. For construction phases, documentation should set out a 'limit of work' line, and lock down staging and minimal access requirements. Minimising site disturbance should also be considered in the maintenance regimes of the operational phase of a development to ensure 