When a Stormwater Management Plan is required Print

Healthy-Waters-NDC_Schedule-4_pg8_Do-I-need-to-prepare-a-SMP.png

Download as PDF


Definitions

Brownfield Large - 20 lots or over new/re-developed 5000m2 impervious surface. 
Any already urbanised land to be redeveloped; often for more intensive or different land use.

Brownfield Small - Any already urbanised land to be redeveloped; often for more intensive or different land use.

Development - Total development area including all future stages.

Greenfield - Land identified for future urban development that has not been previously developed.
Provide Feedback Next Page   Previous Page