There are different performance requirements included in Schedule 4 of the NDC for different development scenarios:
  • Large brownfield and greenfield developments will require a Stormwater Management Plan  
  • Small brownfield developments will not require a Stormwater Management Plan if their proposed stormwater management is consistent with Schedule 4.
  • NZTA/AT/Railways projects which connect into the public network have specific requirements.
  • Healthy waters projects including Auckland Council network renewal, maintenance and upgrade works which generally do not create impervious area.
A Stormwater Management Plan must meet all Schedule 4 requirements and be consistent with Schedule 2 to be adopted. 