Approval Process Print

4.4.1. Approval Process​​
As a guideline, any proposed works affecting stormwater require approval by the council, for example:
  • New connections
  • Re-laying existing stormwater pipelines
  • Diverting existing pipelines
  • Raising or lowering manhole lids
  • New developments
  • Subdivisions
  • Building works to be vested in the council
​If the work involves existing or proposed public assets, an Engineering Approval is required. Building consent is required for all works relating to private drainage. In addition, resource consent may be required.