Turn on more accessible mode
Turn off more accessible mode
Auckland Design Manual Auckland Design Manual
Auckland City Council Auckland City Council
  • Project Type
    • Buildings

      • > Housing

      • > Mixed Use

    • Parks

      • Parks Hub

      • > All Parks

      • > Civic Space

      • > Ecological

      • > Historic

      • > Informal Rec

      • > Landscape

      • > Sport & Active

    • Streets

      • Streets Hub

    • Neighbourhoods

      • Neighbourhoods Hub

      • > Subdivision

    • Infrastructure

      • > Codes of Practice

      • > Technical Guidance

  • Process Guides
    • Unitary Plan Guide

    • Developing New Homes

    • Design Statements

    • Urban Design Panels

    • Developing a Park

  • Design Thinking
    • Māori Design

    • Sustainability

    • Universal Design

    • Design for Safety

    • Health, Activity and Wellbeing

    • Activate Auckland

    • Public Art

  • Resources
    • Case Studies

    • Worked Examples

    • Success Videos

    • Articles

    • Knowledge Base

    • Tools

    • Planner's Toolbox

    • Designer's Toolbox

    • Glossary

    • Contact Us

  • About the ADM
  • Our Blog
  • Search

Back to Top

Contact

Home / Activate Auckland

Guidance for Activation

Resources

  • Show all
  • Case studies
  • Worked examples
  • Articles
  • Tools

Case study: Times Square, New York Print

  • Click to play video
Caption:

Regulatory Note
Delete
Regulatory Note

Regulatory Note

Image:
Add hotspot
Delete Image
Carousel:
Upload image:
Upload large image (optional): Clear
Go to picture library
View on Google Maps >

Overview

The ongoing testing and development of Time’s Square over recent years has highlighted the significant advantages of interim design. Using temporary interventions in the street space, the City Council have been able to test new ideas, prove their worth, and evaluate the concerns of businesses and local communities.

This case study outlines the process of how New York City reclaimed one of its busiest road intersections for pedestrian space. The site is Broadway, at the intersection with 7th avenue and Times Square. The project has become an international precedent for phasing out vehicles in a road space and gradually implementing a successful long-term design for public space.

Project Summary

Project Summary
​​​​​​​​​The project started in 2009 as an experiment under Mayor Bloomberg and the New York City Department of Transportation Commissioner Janette Sadik-Kahn. The project was first titled ‘Green Light for Mid town’, and the initial aims were to improve pedestrian safety and to improve traffic flow. A temporary transformation was first implemented, giving New Yorkers the chance to voice whether they liked the change or not. They wholeheartedly voted for the change to stay, and an international design competition was launched, which was won by the Norwegian practice Snøhetta. 

In late 2013 phase one of Snøhetta’s long term redesign was unveiled, with an expected implementation of 2015. The final redesign encompasses the transformation of five public plazas between 42nd and 47th streets along Broadway. 

The project has far exceeded its initial aims of safety and traffic functionality. The project has become an international benchmark for the successful transformation of a busy car road into well-used public space. Once complete the transformation will add 13,000 sq m, or 53% more of new pedestrian space to Times Square (Dezeen Design Magazine).​
Times Square Case Study
  • Case Study All
    Boxed by seven sisters group
  • Article All
    Activate Auckland - by the people, for the people!
  • Case Study All
    Open Streets 2016
  • Case Study All
    Parklets, San Francisco
  • Case Study All
    Times Square, New York
  • Article All
    Pahikara Pukapuka Book Bike

    Guidance for Activation Print

    1. Introduction 2. Disruption Management 3. Place activation 4. Tactical Urbanism 5. The Keys to Success
    • 1 Introduction
    • 1 Disruption Management
    • 1 Place activation
    • 1 Tactical Urbanism
    • 1 The keys to Success
    Liveable City Representation
    Auckland Design Manual
    • About the ADM
    • Contact us
    • Sign up
    • To Our Blog
    Find us on:
    • Twitter Twitter
    • Facebook Facebook
    • LinkedIn LinkedIn
    • Pintrest Pinterest
    • Sample Logo
    • Sample Logo
    • Sample Logo
    • Sample Logo
    • Sample Logo

    ©2018 Copyright
    Auckland Design Manual

    Welcome

    To Auckland's Design Manual

    The manual provides professional advice, step-by-step best practice processes and detailed design guidance. The manual will enable us all to make informed choice and build homes, and create new streets and neighbourhoods that not only look great but are built to last, sustainable and give best return on investment.

    Click below to proceed to related design guidance

    >

    Disclamer:

    The Auckland Design Manual provides supplementary guidance to the Unitary Plan on design matters, which will be updated by the Council from time to time. The Manual is not part of the Unitary Plan and the Unitary Plan doesn’t incorporate the Manual by reference in the terms of the provisions of Part 3 of Schedule 1 to the Resource Management Act 1991. While the Manual sits outside the Unitary Plan, advice notes are occasionally included in the text of the Unitary Plan to alert the reader to the existence of relevant guidance in the Unitary Plan.